Inspector Responsibilities

A Primary Mission of the Council is to promote effective means of surface preparation in the maintenance industry using water and water/abrasive blasting techniques.

Checkpoints and final inspections shall be signed off by certified coating inspectors.

4.3.4 COATING INSPECTOR RESPONSIBILITIES: Coating inspectors are responsible for requirements listed in NSTM 631, Section 11.7.

4.10.1 Prevent contamination and surface damage of the ship’s equipment, components, and spaces during contamination-producing operations.

4.13.2 Notify the Commanding Officer’s representative immediately when the contractor’s work is complete and the system, piping, or circuit is ready for activation to accomplish removal of tags.

Heavily rusted or corroded area, damaged metal and holes in the structure or piping shall be documented and provided to ship’s force and Responsible Contracting Authority to determine if further structural evaluation or NDT is warranted and for possible repair before surface preparation.

7.5 OUT OF SPECIFICATION DRY FILM THICKNESS: Failure to meet minimum dry film thickness requirements will result in application of an additional coat or coats in deficient areas before the coat can pass DFT checkpoints.

11.2 For areas inaccessible by spray equipment and smaller than 4 square inches, apply one brush coat specified in Ref.

1. From the area to be repaired abrade a two-inch radius of the well-bonded adjacent coating by hand or power tool with a minimum of 40 grit sandpaper to a profile of 1 to 2.5 mils.

13.1.3 In order to pass the checkpoint, any Appendices required by the certified coating inspector shall be up to date or completed and submitted to QA.

[download id=”54″]

Maintenance Costs and Reform

A Primary Mission of the Council is to promote effective means of surface preparation in the maintenance industry using water and water/abrasive blasting techniques.

In Scotland last year a group of coatings manufacturers estimated the coatings maintenance market was $2 Billion Dollars.

The estimation for coatings going over water jetting surfaces was 510%.

While all three are necessary for good coatings performance.

It is the last component, the removal of invisible contaminants and removal of detrital material, that demands water and which requires REFORM and CHANGE.

Everybody in this room has been raised with dry abrasive blasting and dry abrasive blast standards.

All of these coating manufacturers have put coatings over, hundreds of thousands, if not millions, of square feet of various substraates which have been cleaned with water jetting and wet abrasive blasting.

There is flash rusting involved in all of that stuff but it really does not affect the moisture cured polyurethane coatings supplied by Wasser.

Wayne Senick- Back to the text book- this is an article on the first job where there was a five year joint warranty between the coating manufacturer and the contractor.

It was pretty pleasing to see that before cleaning we were at 80-90 µg/cm2 of chloride but every case, every case, we got below 4 µg/cm2.

They were water jetting with sea water.

I come in and ask the question, both to the abrasive and water jetting people, about applications with vacuum attachment.

Lydia Frenzel- I have talked a lot to contractors about how much does it cost for WJ on a square foot basis.

[download id=”53″]

UHP Equipment

A Primary Mission of the Council is to promote effective means of surface preparation in the maintenance industry using water and water/abrasive blasting techniques.

Operating conditions, cleaning rates, and performance differ substantially from standard equipment with several significant advantages applicable in todays environmentally and safety- conscious society.

Early in 1971, the first ultrahigh-pressure compact intensifier pumps were under development representing the only significant technological change in high pressure pumps in recent history.

Based upon the practical and economical use of prime movers, an operating pressure of 35,000 to 40,000 psi was selected, with maximum pump flow rates to 6 gpm.

Most frequently, this tool is equipped with two to four .009″ diameter nozzles and used to remove heavy, thick materials such as rubber or concrete.

The high speed jets of water cut through many energy-absorbing materials rapidly, and erode large quantities of the more stubborn materials much faster than low pressure/high volume water or grit blasting.

This same tool can be used to do “dental work” on concrete structures removing deteriorated concrete from spaulled areas while simultaneously providing a light surface scarification for new protective coatings.

the same ultrahigh-pressure pump can be used to remove a coating, lightly scarify, decontaminate, or erode deep into the concrete by simply changing the application tool/end effect.

The size of the nozzle used on the rotating lance is dependent upon the thickness and tensile adhesion of the coating.

High velocity jets are especially well suited for this type of use since the jet speed allows actual cutting of the rubber just prior to separation from the substrate.

[download id=”52″]

Benchmark Cost Study

A 1975 benchmark study by Battelle-NBS calculated the cost of corrosion to be $70 billion per year, which was 4.2 percent of the nation’s gross national product (GNP).

In this study, the total direct cost of corrosion was determined by analyzing 26 industrial sectors in which corrosion is known to exist and extrapolating the results for a nationwide estimate.

For all industry sectors studied in this report, the direct corrosion costs were determined.

However, for one industry sector, highway bridges, a life-cycle cost analysis was performed in which both the direct and indirect costs of corrosion were addressed.

Corrosion is typically found on piers and docks, bulkheads and retaining walls, mooring structures, and navigational aids.

Based on cost numbers obtained from the U.S. Army Corps of Engineers and the U.S. Coast Guard, an annual corrosion cost of $0.3 billion could be estimated.

Discussions with people in this industrial sector resulted in an estimate of corrosion costs in the range of 5 percent to 10 percent of the value of all new equipment.

Assuming that the stainless steel consumption and cost in this industry is entirely attributed to corrosion, a total annual direct cost of corrosion is estimated at $2.1 billion.

Direct corrosion costs per BEA industry category………………………………………………………………..61 Figure 29b.

The input/output method was adopted later by studies in two other nations, namely Australia in 1983(5) and Kuwait in 1995.(6) In the United Kingdom, a committee chaired by T.P. Hoar conducted a national study in 1970 using a method similar to the one used by Uhlig.

[download id=”51″]

UHP Standards and Parameters

The purpose of NSRP Project 3-96-4 was to evaluate the productivity of and areas of hydroblast (water-jetting) removal of coatings on representative areas of a ship, such as the hull, non-skid decking areas, tanks, complex geometry using open and closed loop systems.

These procedures include surface cleanliness, surface contamination, coating removal rates, visual appearance, flash rust, and waste collection.

For the purposes of this report, the term “hydroblasting” in the abstract is used to connote the removal of coatings by using high pressure or ultra-high pressure water.

The current SSPC-SP 12/NACE 5 standard on water-jetting (prepared by NACE/SSPC Joint Task Group D on Surface Preparation by High Pressure Water-Jetting) uses the term “water-jetting” to connote coating removal by water at pressures above 10,000 psi.

Determination Of Test Procedures And Standards For Evaluation Parameters (Task 3) During production runs of the various hydroblasting equipment, various parameters were evaluated.

In most cases initial values were determined.

The first group of data (Graph 2), “USS Duluth (ballast tank)” were production rates from the hydroblasting of ballast tank 8-84-4-W.

The specification for the blasting of this tank was to spot blast to bare metal all corroded areas and sweep blast all other areas in order to remove staining, and provide a clean, profiled surface for subsequent coating adhesion.

Inboard Immersion 950 60% primer to steel, 40% cohesive in adhesive All final (after blast) adhesion values had high adhesion values.

Comparing the initial and final “Mode of Failures” for the four locations in the ballast tank where adhesion increased, the mode of failure with respect to the topcoat decreased.

[download id=”50″]

Blistering on Panels

Neither the United States, nor the Maritime Administration, nor any person acting on behalf of the Maritime Administration, (A) makes any warranty or representation, expressed or implied, with respect to the accuracy, completeness or usefulness of the information contained in this report/ manual, or that the use of any information, apparatus, method, or process disclosed in this report may not infringe privately owned rights; or (B) assumes any liabilities with respect to the use of or for damages resulting from the use of any information, apparatus, method, or process disclosed in the report.

commonly occurring in the marine environment, have on epoxy coating systems.

ASTM method for determining degree of blistering.—————PAGE A9 SSPC conversion method for determining blistering from ASTM method.

This can be a major contaminant, if the clean up after blasting, is not done completely.

The tests found that no blistering occurred if the contamination was below 4 micrograms per square centimeter.

NOTE: THE PANEL BLISTERING WAS RATED BY THE SSPC MODIFICATION A 10 RATING IS PERFECT AND OF THE ASTM D714 BLISTER SCALE.

NOTE: THE PANEL BLISTERING WAS RATED BY THE SSPC MODIFICATION OF THE ASTM D714 BLISTER SCALE.

The contamination levels ran from 1.25-500 MICRO-GRAMS sulphate PER.

COMMENTS ON SERIES # 9 (Note: No graph was done for this series.) This test series (36 tests) was run with various thickness applications of Sovapon over Ferrous Sulphate contamination.

At low contamination levels, this type of blistering did not have active corrosion under still sound blisters.

This two of break down in way of the small grit particles.

[download id=”49″]

Baseline Measurements and Risk Factors

·Atlantic Marine Holding Company – (Prime Contractor) Will contribute shipyard resources and shipyard facility.

· Worker fatigue induced by activities involving prolonged and repetitive use of heavy tools and equipment ·Discharge of water (process and storm water) contaminated with heavy metals into adjacent waterways and onto adjacent property via storm drains and into the ground water by percolation.

·Increasing life cycle cost associated with the surface preparation process.

IE studies were completed on current processes; Current material costs were determined;industry surveys were performed to obtain baseline metrics; metrics validated for fatigue factor inherent in current process; current environmental containment processes were documented and measured.

Task 4: Provide Ergonomic Solutions to decrease the fatigue factor Identify ergonomic risk factors associated with the uhp water blasting process; Implement ergonomic interventions and establish evaluation metrics to measure the impact of the interventions on the fatigue factor.

·Use a support for the forward part of the water-blasting gun instead of asking the operator to reach out and support the equipment all day.

·Currently no accurate system of estimating number of waterjetting injuries ·Majority of Water-jet companies are small “mom and pop” operations with undocumented workers.

Task 8: Perform shipyard trials of the recommended improvements Implement recommended ergonomic, process, material, and environmental improvements; Perform IE analysis to measure the impact of solutions on fatigue factor, safety performance, productivity, and overall cost of process; Implement recommended environmental improvements and measure impact on levels of storm water contamination.

Task 9: Demonstrate final results to industry.

[download id=”56″]

Ergonomics of UHP

The project team will strive to achieve a 50% reduction in total costs associated with the UHP Water Blasting Process through industrial engineering methods, ergonomic analysis, and environmental engineering efforts.

·18 shipyards responded to survey (374 surveys mailed) ·38% of responses indicated that they use UHP Waterblasting for surface preparation ·The respondents indicated that most UHPWJ is performed inhouse, rather than sub-contracted.

·Average production rate reported for manual blasting to bare metal was less than 50 sq ft per man-hour.

·Average production rate reported for closed cycle UHPWJ to bare metal was 200 – 300 sq ft per man-hour.

Will continue efforts in root cause analysis.

Project Status was presented to the NSRP Surface Coatings Panel (SP-3) and the Environmental Panel (SP-1).

The SP-3 planned their fall meeting at Todd Shipyard in October, where a water blasting demonstration will be held with select vendors.

The project status was presented at Ship Production Process Panel Meeting on 8/23/00 in Williamsburg, VA.

[download id=”55″]

Costs of Incidents

Few safety departments have systems in place to verify these statements, however.

Furthermore, companies which use verification systems that simply capture cash costs are missing a significant piece of the true incident cost puzzle.

If the department does not understand an organization’s true financial loss, senior management will find it difficult to see what financial benefits the S&H department provides.

To determine average direct incident costs for a given time period, one sums the actual cash costs, divides that total by the number of incidents, and records this average in the total incident costs (TIC) worksheet (Figure 1).

To determine average indirect costs, one must multiply the average time (in hours) a department spends on incidents by the average hourly compensation rate; the result is then recorded in the TIC worksheet.

Finally, one adds direct costs to indirect costs to arrive at total incident costs.

Consultation with the victim; recordkeeping and filing; follow-up consultation; disciplinary action.

These supplemental compensations are often difficult to determine and, unless applied consistently, introduce an unstable element to the calculations.

By working to minimize these costs, safety professionals will be able to exhibit fiscal responsibility and show the value-added aspects of safety efforts.

Presentation at 1998 American Industrial Hygiene Conference, Atlanta.

. “What Does Management Think About Safety and Health?”

Jeffery E. LaBelle, CSP, CIH, is safety manager for Gateway, located in North Sioux City, SD.

He holds a B.S. in Physiology from Michigan State University, an M.S. in Industrial Hygiene from the University of Michigan and an M.B.A. from the University of Toledo.

LaBelle is a member of ASSE’s Northwest Chapter and Chair of its Siouxland Section.

Circle the corresponding number on the reader service card.

[download id=”46″]

Partnering for the Environment

Because of the inherent types of operations, processes and some of the materials utilized in the shipbuilding and ship repair business, these facility are subject to regulatory oversight, specifically in this case, environmental regulation.

Conventional stormwater management activities that are effective at other types of facilities may not necessarily be effectively implemented at a shipyard.

There are numerous factors that contribute to this circumstance.

Consequently, the regulatory agency that has permitting authority has a very difficult job in developing a stormwater discharge permit that meets all of the regulatory requirements and can be effectively implemented in a shipyard.

A stormwater permit that can be effectively implemented in the shipyard and that goes beyond standard compliance to provide maximum protection of the environment, where feasible.

There are enormous advantages to working out the details of the permit prior to initiating the permit drafting process, notwithstanding the elimination of potential litigation.

A collaborative, systematic and comprehensive investigation of all of the aspects of a facility that have the potential for impacting stormwater discharges is essential prior to commencing to draft the permit.

Additionally, the sharing of concerns and ideas gives both the facility and the regulatory agency a feel for the others perspective, and in many cases results in the development of an innovative solution.

Atlantic Marine and the Florida Department of Environmental Protection have discovered that “Partnering for the Environment” is the most constructive manner in which to approach the permitting process.

· Regulatory Agency may revise/modify the Permit at any time if regulations or standards change or to provide additional protection to the environment.

[download id=”43″]